Ecological Revetment
Palm stone: Specification: 1,000×1,000×230mm, compressive strength ≥20MPa, porosity ≥18%, weight ≥350kg/㎡.φ12mm hot-dip galvanized steel bars are used to chain all blocks into a flexible anti-deformation structure to improve the overall anti-subsidence and deformation ability of the dam and achieve comprehensive greening of the slope.
  • 1000×1000×230mm, weight ≥ 350kg
  • The outer layer is covered with a palm fiber layer
  • The interior is made of large-aperture sand-free concrete
  • 2 φ12mm hot-dip galvanized steel bars are penetrated inside
  • laid
  • Flexible connection of rigid blocks
  • Steel ring lock
  • φ12mm hot-dip galvanized steel bar connecting ring
  • Wuhan Nananzui was paved 2007.12
  • Wuhan Nananzui 2008.1
  • Wuhan Nananzui 2008.5
  • Nananzui Facing the Water Surface 2008.6
  • Guangzhou Tianlong River was paved 2010.12
  • Tianlong River 2011.3
  • Tianlong River 2011.8
  • The current Tianlong River
  • Construction sites in Japan
  • Laying permeable geotextiles
  • Single level slope length 10m, multi-level slope
  • Lay 2 pieces on the bottom
  • Spring flood washed away the covering soil after construction
  • Water currents bring sediment and vegetation gradually recovers.
  • Full vegetation coverage, after mowing in autumn.
  • Topsoil is laid back, and native plants grow luxuriantly.
"Outline for the Compilation of Comprehensive Regulation Planning for County-level Rural Rivers" by the Planning Department of the Ministry of Water Resources and the General Water Planning Institute of the Ministry of Water Resources (2011 - 2015)

Deeply implement the Scientific Outlook on Development, and in accordance with the requirements of the Central Document No. 1 in 2011 and the Central Water Conservancy Work Conference, actively implement new ideas for sustainable development and water management, with the goal of "smooth rivers and clear waters, green banks and beautiful scenery, sound functions, and harmonious people and water", focusing on solving outstanding problems such as the decline of rural river functions and the deterioration of the water environment, we will focus on investing in and promoting rural areas through measures such as water system communication, river dredging, bank slope improvement, and ecological restoration. We will achieve results, focusing on restoring river functions, improving flood discharge and drainage capabilities, improving rural water environment, promoting new development of people's livelihood and water conservancy, and promoting coordinated urban and rural development and the construction of a new socialist countryside. The outline clearly states that revetment building materials include palm stone

Shenzhen Water Affairs Bureau "Shenzhen River Regulation Planning Report"(2014 - 2020)

Guiding ideology: Guided by the spirit of the 18th National Congress of the Communist Party of China, we will thoroughly implement the Scientific Outlook on Development, follow the overall goal of "clear water, green shores, beautiful scenery, and smooth rivers", adhere to the planning and design concept of "safety, resources, environment, ecology, and landscape", and use Ecological civilization as the guide, flood control safety as the prerequisite, water quality assurance as the focus, ecological landscape as the highlight, and strengthening management as the means to realize river services, supports and guarantees urban economic and social development. Ecological principles: Emphasize the role of rivers in improving urban ecological environment. It includes three aspects: one is to emphasize the important role of rivers in urban ecosystems; the other is to avoid damage to water ecosystems; and the third is to adopt ecological measures when necessary renovations of rivers. Palm stone as the main material for revetment has been clearly included in the planning report

Various types of ecological revetment ▪ Retaining walls
Ecological revetment and ecological retaining walls have different shapes and functions. According to the terrain conditions and functional requirements of the construction site, they can be tailored to different customer needs. Connection methods can be divided into inlay, locking, hinging, anchoring and cast-in-place concrete connection; porous, frame-shaped, sand-free concrete permeable, rock-like, etc. can be produced.
  • retaining wall
  • Different shapes can be grouted up and down
  • Surface splitting imitation stone
  • Can be colored throughout the body and split imitation sandstone
  • Various improved versions, filled with stones inside.
  • Anchoring with locks at the top and bottom
  • Paving protective block
  • I-shaped hydraulic block
  • Interlocking laying effect
  • The integral pressing grooves can be interlocked
  • Large porous plate
  • hollow brick for slope protection
  • hollow brick for slope protection
  • laying effect
  • The U-shaped ditch covers the palm layer and can be greened.